>> Lagoon Club
- Project Concept
- Specifications
- Gallery
>> Holiday Inn Taba
- Project Concept
- Specifications
- Gallery
>> Site Map

LAGOON CLUB

- Finishing Specifications:

Location

The project includs an integrated utility network for electricity, water and drainage.
A network for fire extinguishing as well as an irrigation network for greenareas and gardens of each villa.
Internal and external telphone network.
Central station for satellites and private connection for each villa.
Aswimming pool supplied with frech water for each group of villa , suitable for old and young who do not like to swim in salt water.
Central , commercial , recreational services as well as restaurants , cafeterias in the hotel,managed by one of the hotel management companies in Egypt.

Units

  • Floors and walls
    The salons, receptions, dinning rooms and entrance are made of Egyptian Luxrious ceramics.
    Bedrooms' floors are made of Egyptian Luxrious ceramics.
    Terraces are made of Egyptian Luxrious ceramics.
    Floors and walls of bathrooms and Kitchens are are made of Egyptian Luxrious ceramics.
    Rooms salons and receptions' walls are painted by Luxrious plastic polish that could be washed easily by water and resist humidity.
    Gypsum Cornish ( ornaments for walls ) for salons, reception, dinning and living rooms


  • Electricity Work
    Luxrious electric accessories.
    Separate wall sockets in the Kitchen and master bathrooms.
    Panel board with automatic switches sufficient for the electric loads in the villa and for the installation of air - conditioning appliances.


  • Wood And Aluminum Work
    Windows are made of the best type of Egyptian aluminum.
    Room doors are made of wood and Alkyde polish.
    The outer doors of the villas are made of hollow core and oyster polish

Project Concept Gallery  
Copyright © 2005 IMBT. All rights reserved
 
Designed by - Wael Elhabibi